Masaq Index
arXiv 2019-12-06 0 views

Experience with Long-pulse Operation of the PIP2IT Warm Front End

Shemyakin, A. · Carneiro, J. -P. · Chen, A. · Frolov, D. · Hanna, B. · Neswold, R. · Prost, L. · Saewert, G. · Saini, A. · Scarpine, V. · Warner, A. · Wu, J. -Y. · Richard, C.

Original · EN

The warm front end of the PIP2IT accelerator, assem-bled and commissioned at Fermilab, consists of a 15 mA DC, 30 keV H- ion source, a 2 m long Low Energy Beam Transport (LEBT) line, and a 2.1 MeV, 162.5 MHz CW RFQ, followed by a 10 m long Medium Energy Beam Transport (MEBT) line. A part of the commissioning efforts involves operation with the average beam power emulating the operation of the proposed PIP-II accelera-tor, which will have a duty factor of 1.1% or above. The maximum achieved power is 5 kW (2.1 MeV x 5 mA x 25 ms x 20 Hz). This paper describes the difficulties encoun-tered and some of the solutions that were implemented.

English translation

This paper has no Arabic translation yet. Be the first: it takes a few seconds, and the result is stored for every future reader.

Security check

Type the characters above

Up to 10 translations per person per day.