المساق
arXiv 2007-03-05 DOI 10.1103/PhysRevA.76.042114 0 مشاهدة

Uncertainty Relations for Positive Operator Valued Measures

Massar, Serge

الأصل · EN

How much unavoidable randomness is generated by a Positive Operator Valued Measure (POVM)? We address this question using two complementary approaches. First we study the variance of a real variable associated to the POVM outcomes. In this context we introduce an uncertainty operator which measures how much additional noise is introduced by carrying out a POVM rather than a von Neumann measurement. We illustrate this first approach by studying the variances of joint estimates of σₓ and σz for spin 1/2 particles. We show that for unbiased measurements the sum of these variances is lower bounded by 1. In our second approach we study the entropy of the POVM outcomes. In particular we try to establish lower bounds on the entropy of the POVM outcomes. We illustrate this second approach by examples.

الترجمة العربية

لا توجد ترجمة عربية لهذا البحث بعد. كن أوّل من يطلبها: تستغرق ثوانيَ معدودة، وتُحفظ النتيجة لكل قارئ قادم.

تحقّق أمني

اكتب الأحرف الظاهرة أعلاه

حتى 10 ترجمات لكل شخص يومياً.